CLT wall panel lifted by a crane during the assembly of a family house

Design · Project · Construction

We built the shell in 4 days.

Family house, 106 m², including fitted windows. Vyšný Klátov. We built in December.

CLT in brief

Solid wood, dry assembly.

CLT (cross-laminated timber) is the load-bearing structure of walls, floors and roofs. The panels are made in advance and assembled on site.

4 days
shell of a 106 m² family house, including fitted windows
Even in winter
dry assembly without drying, we built in December
REI 30 / 60 / 90
fire resistance is designed according to the project
100+ years
lifespan comparable to masonry
More about CLT →
Interior of a house with visible CLT panels on the walls and ceiling

Process

From plan to construction in one process.

  1. 1Plan analysis
  2. 2Architecture and optimisation
  3. 3Planning and engineering
  4. 4Production preparation
  5. 5Construction
Full process and services →

Send us the basic information about your project.

Just the building type, approximate area, project phase and the scope you expect from us. We will get back to you with a proposal for the next steps.

Write to us