Design · Project · Construction
We built the shell in 4 days.
Family house, 106 m², including fitted windows. Vyšný Klátov. We built in December.
Who it's for
One partner for the whole project.
Depending on which side of the project you are on, the cooperation looks different.
Projects
Our projects.
CLT in brief
Solid wood, dry assembly.
CLT (cross-laminated timber) is the load-bearing structure of walls, floors and roofs. The panels are made in advance and assembled on site.
- 4 days
- shell of a 106 m² family house, including fitted windows
- Even in winter
- dry assembly without drying, we built in December
- REI 30 / 60 / 90
- fire resistance is designed according to the project
- 100+ years
- lifespan comparable to masonry

Process
From plan to construction in one process.
- 1Plan analysis
- 2Architecture and optimisation
- 3Planning and engineering
- 4Production preparation
- 5Construction
Send us the basic information about your project.
Just the building type, approximate area, project phase and the scope you expect from us. We will get back to you with a proposal for the next steps.
Write to us- Ing. Rastislav ŠimkoSales Director+421 905 444 339
- Ing.arch. Igor WawrekDesign Director+421 918 673 913


