CLT for developers and investors
Speed, coordination and predictability are decisive. We connect architecture, project preparation, engineering and construction into one coordinated process.
Cooperation
What you get.
- 01
Shorter shell-construction phase
Assembly without technological breaks.
- 02
More precise preparation
Openings, penetrations and connections resolved before production.
- 03
One coordinated team
Design, planning and construction always work toward the same goal.
Why CLT
Arguments for the investment.
Cheaper financing
Shorter construction — shorter loan drawdown, earlier sale or rent.
More sellable m²
Thinner walls free up more usable area on the same footprint.
One partner
Design, structural engineering and construction from one place — a predictable budget and schedule.
Eco-friendly building
Wood is a renewable material with a low carbon footprint — an advantage for project financing, marketing and ESG reporting.
How CLT saves time compared with the wet process: Wet vs. dry process →
Building types
For which projects
Apartment buildings
Multi-storey residential projects for sale and rent.
Office and business centres
Office and mixed-use buildings.
Hotels and guesthouses
Accommodation capacity with fast construction.
Retail and shopping spaces
Shops, showrooms and commercial units.
Public amenities
Schools, kindergartens and public buildings.
Frequently asked questions
How does CLT compare to masonry construction?
A CLT building is comparable in price to masonry. The key difference is time — CLT assembly is significantly faster, and shorter construction means lower financing costs and earlier sale or rent. And time is money.
Can a bank finance and an insurer insure a CLT building?
Yes. A CLT building can normally be financed with a mortgage and insured. Both the bank and the insurer assess the specific project and documentation — with a certified solid timber structure this is not an obstacle. We help prepare the documents they need for it.
How is fire protection addressed?
Solid wood burns predictably — it chars at approximately 0.6–0.8 mm per minute and the charred surface layer protects the core of the cross-section, which retains its load capacity. We design the structure for the required fire resistance (REI 30 / 60 / 90) according to the type and height of the building, with cladding (e.g. plasterboard) if needed. The solution complies with applicable standards and the building is normally insurable.
Send us the basic information about your project.
Just the building type, approximate area, project phase and the scope you expect from us. We will get back to you with a proposal for the next steps.
Write to us- Ing. Rastislav ŠimkoSales Director+421 905 444 339
- Ing.arch. Igor WawrekDesign Director+421 918 673 913
